Mr & Mrs Soulsby contacted us with the issue of the floor in there bathroom rotting away. They wished to demolish the whole bathroom and start from scratch. We removed all appliances, flooring, plaster from walls and ceiling. Upon removing the shower recess we found the source of the rotting floor which was also rotting the plaster away on an internal wall, this was also replaced. We installed new shower recess, vanity and a new toilet. The bath was not renstalled and a larger shower was instead installed. We tiled the walls up too 1200mm high and tiled the floor, installed new clear glass shower screen and installed all bathroom fixtures as required. We also decided to remove the existing window and install a new larger window in frosted glass. Finally giving it all a coat of paint. This project took approximatley 3 weeks to complete with the shower being out of action for approximately 8 days.